










A batch of crane trucks on the JAC N120 — a flatbed with a crane behind the cab. The truck loads itself: arrive on site, put down the outriggers, lift off a pallet or a pipe, and drive on. No forklift, no dock, no second vehicle. We build the platform and the subframe for the crane, install it and hand over the complete unit.
| Make / model | JAC N120 |
| Engine | Cummins ISF3.8S5168 diesel, Common Rail + SCR, Euro 5 |
| Engine displacement | 3 760 cc |
| Power | 166 hp (122 kW) |
| Torque | 592 N·m at 1 300–1 700 rpm |
| Gearbox | manual, 6-speed |
| Wheelbase | 4,700 mm, mounting length 6,200 mm |
| Gross weight | 11,980 kg |
| Brakes | air, ABS |
| Vehicle category | C |
| Chassis payload | 7,690 kg |
Chassis specifications are on a separate page.
| Body type | flatbed platform with a loader crane |
| Deck length | 6,200 mm (less the space taken by the crane) |
| Crane | mounted behind the cab on a reinforced subframe |
| Sides | aluminium, folding on three sides |
| Outriggers | extending outriggers on both sides |
| Deck floor | flat along the whole length, no protrusions |
| Side underrun protection | aluminium, to safety requirements |
| Lead time | from 14 working days |
More about the design on the page flatbed platforms.
A crane truck on a JAC N120 solves the main supply problem: sites rarely have a forklift. The crane behind the cab lifts the load off the platform and places it where the truck cannot reach — over a fence, onto the second tier of a warehouse, down into a pit. One vehicle instead of a truck-plus-forklift pair.
You pay for it in payload: the crane and its subframe take part of the chassis’ 7,690 kg, and the usable deck length shrinks by the space the boom occupies. So we work the configuration out in advance: what weight and reach the crane needs, and what is left for the load.
COND builds the flatbed platform and the reinforced subframe for the crane, installs the crane on the chassis, runs the hydraulics and outriggers, and fits the aluminium folding boards and side guards. The crane itself is a bought-in unit, chosen for the job by lifting moment and boom reach.
Extending outriggers on both sides: the crane must not work without them or the truck will tip. The subframe is calculated for the crane’s moment; otherwise the chassis frame will crack within the first season.
Construction and site supply, metal depots, traders in profile, pipe and slab, installation crews, delivery of machinery and equipment. If you do not need the crane, we build the same body as an open flatbed platform, and for a curtain — as a curtain-side.
Walk-arounds from our YouTube channel.

Our other projects in the “flatbed platform” category. All body types are in the “Vehicles” section.
Leave your contact details — we will confirm availability/lead time and quote a price.
📞Phone