EN | KZ | RU
Van bodies
Vehicles
Equipment
Components
Services
Trucks in stockBlogFAQGet a quote
Home / Van body repair / Van floor repair

Van body floor repair in Almaty

The van floor is repaired in full or in sections: swollen plywood is removed, the structural part of the deck is restored and a new deck is laid. Chequer-plate aluminium can replace plywood — it does not absorb moisture. Floor repair — from 100,000 ₸, lead time 1–13 days.

Work

What the work includes

  • Removal of the damaged covering and plywood.
  • Inspection and restoration of the structural deck.
  • Laying a new deck: anti-slip plywood or chequer-plate aluminium.
  • Sealing of joints and floor-to-wall junctions.
  • Fitting cargo securing rings and rails — on request.
Diagnosis

Symptom, cause, work

SymptomUsual causeWhat is done
The floor flexes, the plywood is swollenmoisture got into the deck through joints or the silldeck replaced, structural part restored
The floor is dented by palletsload from pallet truck wheels and palletssection of deck replaced; option — chequer-plate aluminium
Water under the deck after washingfloor-to-wall joints have openedjoints and junctions sealed
Materials

Materials

The plywood is anti-slip; the option is chequer-plate aluminium, which does not absorb moisture or rot. Cargo securing rings and lashing rails come from the hardware catalogue.

Price and lead time

Price and lead time

WorkPriceLead time
Floor repairfrom 100,000 ₸1–13 days

“From” prices are for labour without materials. The exact price and lead time follow a body inspection.

Send photos — get a price and lead time

For a preliminary estimate send photos: overall front and rear views, the body maker’s plate, the inside and the damaged area. The exact price follows an inspection.

Send photos on WhatsApp
FAQ

FAQ

Can a van floor be replaced?

Yes. The swollen plywood is removed, the structural deck is restored and a new deck is laid on top. Chequer-plate aluminium can be fitted instead of plywood.

How much does a van floor repair cost?

From 100,000 ₸ without materials, 1–13 days; the exact price follows an inspection.

Why does floor plywood swell?

Moisture gets into the deck through joints or the sill — so the joints are sealed as well when the floor is replaced.

Request

Book a repair

Describe the problem and send damage photos via WhatsApp — we will assess the scope of work.

📞Phone
+7 777 233-69-28
💬WhatsApp
Send a photo of the damage

Repair request